News
Revised Proposal for the Roy Hill Iron Ore Mine – Environmental Review Document
Roy Hill Iron Ore Pty Ltd
Revised Proposal for the Roy Hill Iron Ore Mine – Environmental Review Document
11 January 2021 – 25 January 2021
Roy Hill Iron Ore Pty Ltd (RHIO) proposes to amend the existing Roy Hill Iron Ore Mine Proposal to increase the ground disturbance footprint by 5,995 hectares, incorporate a life of mine water management strategy (including water abstraction, dewatering and Managed Aquifer Recharge), revise the waste material management strategy including changes to backfilling of pits and waste rock dump locations, develop permanent surface water structures and have an increase to greenhouse gas emissions via the Revised Proposal.
An Environmental Review Document (ERD) has been prepared by RHIO in accordance with Environmental Protection Authority procedures and is released for public review.
The ERD describes the Revised Proposal, examines the likely environmental effects and the proposed environmental management procedures associated with the Revised Proposal.
Hard copies of the document may be purchased for $10 (including postage and packaging) or a CD version is available free of charge from:
RHIO
5 Whitham Road Perth Airport 6105
6242 1000
Copies of the document may also be downloaded from www.epa.wa.gov.au or www.royhill.com.au.
Copies of the document will be available for examination at:
- State Library of Western Australia (25 Francis St, Perth)
- Shire of East Pilbara Public Library (Kalgan Drive, Newman)
Public submissions are to be received by the EPA by 25 January 2021
Submissions are to be made at: https://consultation.epa.wa.gov.au.
Alternatively submissions can be
- posted to: Chair, Environmental Protection Authority, Locked Bag 10, Joondalup DC, WA 6919.
- delivered to: the Environmental Protection Authority, Prime House, 8 Davidson Terrace, Joondalup 6027.
If you have any questions on how to make a submission, please ring the EPA Services of the Department of Water and Environmental Regulation on 6364 7000.
Revised Proposal – Environmental Review Document – Public Environmental Review
Appendix 03 – Groundwater Model Transport Simulations
Appendix 04 – MAR Groundwater Data Review
Appendix 05 – Mine Closure Plan 2018 -2021 DRAFT
Appendix 06 – S38_Hydraulic_Structures
Appendix 07 – World View 3 GDV mapping
Appendix 08 – Consolidated Flora and Vegetation Report
Appendix 09 – LOM WMS Vegetation Risk Assessment inc Add 2
Appendix 10 – Roy Hill Vegetation Management Plan – Mine
Appendix 11 – Survey Effort Maps for MNES and Fauna.pdf
Appendix 12 – Ecologia Environment (2006) SRE Survey 2006
Appendix 13 – Ecologia (2008b) Additional SRE Survey Report
Appendix 14 – ENV Australia (2009) Roy Hill Borefield Vertebrate Fauna Assessment
Appendix 15 – Roy Hill Iron Ore Project Borefield Desktop Survey (Ecologia, 2009)
Appendix 16 – Ecologia (2009d) Short-range Endemic Desktop Survey
Appendix 17 – Western Australian Museum (2009) The SRE Invertebrate Fauna of Roy Hill
Appendix 18 – Ecologia (2010) Additional SRE invertebrate survey
Appendix 19 – Ecologia Environment (2009b) Remote Borefeild & Pipeline Short Range Endemic Survey
Appendix 20 – Bennelongia (2011) Monitoring SRE at RHIO 2011
Appendix 21 – Bennelongia (2012) Monitoring SRE at RHIO Feb 2012
Appendix 22 – Bennelongia (2013) Monitoring SRE Invertebrates at RHIO April-July2013
Appendix 23 – Roy Hill Fauna List
Appendix 24 – Ecologia 2009d Level 2 Detailed Fauna Survey
Appendix 25 – Biologic 2017 Level 1 Targeted Fauna Survey
Appendix 26 – Biologic 2018a Level 1 Targeted Fauna Survey
Appendix 28 – Ecologia 2008 Level 1 Fauna Survey
Appendix 29 – Biologic 2020 Level 1 Targeted Survey
Appendix 30 – Roy_Hill_Night_Parrot_Survey_Final
Appendix 32 – Roy Hill Short Range Endemic Species List
Appendix 33 – Ecologia (2009) Interim SRE Invertebrate Report
Appendix 35 – Mine Vertebrate Fauna Management Plan
Appendix 36 – SWIB Troglofauna Assessment
Appendix 37 – Subterranean Fauna LOM WMS Desktop Review
Appendix 38 – Remote MAR Subterranean Fauna and Hydrogeology_241120
Appendix 39 – TSF Decant Water Re-use Risk Assessment
Appendix 40 – Peer Review of LOM WMS
Appendix 41- Roy Hill Mine Water Management Plan
Appendix 42 – Greenhouse Gas Management Plan – Roy Hill Iron Ore Mine
Appendix 43 – Roy Hill Rehabilitation Success Report
Appendix 44 – Conservation Significant Fauna Offset Strategy
Appendix 45 – Impact Reconciliation Procedure
Appendix 46 – EPBC Act Protected Matters Search August 2018
Appendix 47 – MNES Regional Distribution Maps
Appendix 48 – Migratory Birds Regional Distribution Maps